• Industry Expertise
    • Energy
      • Hydrogen
      • Energy Management & Carbon Reduction
      • Solar & Renewable Energy
      • Energy Storage
      • Microgrid & Offgrid
      • Cogen and Trigeneration
      • Diesel Generator Systems
      • Power Distribution & Networks
    • Processing & Manufacturing
      • Green Manufacturing
      • Food Processing and Fast-Moving Consumer Goods
      • Resource Recovery
      • Chemical Storage, Handling & Processing
      • Agribusiness
      • Data Centres / Critical Infrastructure
      • Defence
    • Water
      • Treatment
      • Recycling
      • Supply Infrastructure & Distributed Networks
      • Recreational Facilities
    • Automation
  • How We Help
    • We Advise
      • Owner’s Engineering & Advice
      • Concept Design & FEED
      • Feasibility Studies
      • Audits, Risk & Compliance
      • Dangerous Goods & Hazardous Areas
      • Arc Flash Assessment & Classification
      • Power System Studies
      • Carbon Reduction & Climate Active Certification
    • We Design
      • Drafting & 3D Modelling
      • Detailed Design
      • Electrical Engineering
      • Mechanical Engineering
      • HVAC Design
      • Process Control & Automation Design
      • Fire Safety and Supression
    • We Build
      • Project & Construction Management
      • Commissioning & Ops Support
      • Risk Management
      • Turnkey Project Delivery
    • We Manufacture
      • Switchboards
      • Local Control Panels
      • Motor Control Panels
  • Our Experience
  • About Us
    • Team
      • People
      • Qualifications
    • Systems
      • Integrated Management System
    • Our Why
      • Purpose / Vision
      • Partnering With Us
      • Our Story
  • Contact
  • Industry Expertise
    • Energy
      • Hydrogen
      • Energy Management & Carbon Reduction
      • Solar & Renewable Energy
      • Energy Storage
      • Microgrid & Offgrid
      • Cogen and Trigeneration
      • Diesel Generator Systems
      • Power Distribution & Networks
    • Processing & Manufacturing
      • Green Manufacturing
      • Food Processing and Fast-Moving Consumer Goods
      • Resource Recovery
      • Chemical Storage, Handling & Processing
      • Agribusiness
      • Data Centres / Critical Infrastructure
      • Defence
    • Water
      • Treatment
      • Recycling
      • Supply Infrastructure & Distributed Networks
      • Recreational Facilities
  • How We Help
    • We Advise
      • Owner’s Engineering & Advice
      • Concept Design & FEED
      • Feasibility Studies
      • Audits, Risk & Compliance
      • Dangerous Goods & Hazardous Areas
      • Arc Flash Assessment & Classification
      • Power System Studies
      • Carbon Reduction & Climate Active Certification
    • We Design
      • Drafting & 3D Modelling
      • Detailed Design
      • Electrical Engineering
      • Mechanical Engineering
      • HVAC Design
      • Process Control & Automation Design
      • Fire Safety and Supression
    • We Build
      • Project & Construction Management
      • Commissioning & Ops Support
      • Risk Management
      • Turnkey Project Delivery
  • Our Experience
  • About Us
    • Team
      • People
      • Qualifications
    • Systems
      • Integrated Management System
      • Sustainability
    • Our Why
      • Purpose / Vision
      • Partnering With Us
      • Our Story
  • Contact
Expanding QANTAS Head Office tri-generation plant

Expanding QANTAS Head Office tri-generation plant

by cnfadev | Nov 17, 2021 | Cogen & Trigeneration, Green Manufacturing, Processing & Manufacturing

Brookfield sought to upgrade the capacity of Australia’s largest commercial tri-generation plant, to provide power for QANTAS’ head office, flight catering and other businesses and several future sites within the precinct. The original plant consisted of boilers,...

Related Projects

  • Using biogas recovery for leaner and greener beef processing
  • Minimising OPEX for a large Intermodal supply chain solution
  • Powering Sydney’s new sustainable urban renewal precinct
  • Expanding the facilities at Rio Tinto’s Silvergrass and Nammuldi mines
  • Upgrading conveyor loading systems for faster grain processing

Applied Services

Arc Flash Hazard Analysis Audits Risk Compliance Carbon Reduction & Climate Active Certification Commissioning & Ops Support Communication Networks Concept Design & FEED Detailed Design Drafting 3D Modelling Electrical Engineering Feasibility Studies Fire Safety and Supression HVAC Design Mechanical Engineering Owner's Engineering Advice Power System Studies Process Control Automation Design Project Construction Management Turnkey Project Delivery

Industry Expertise
Energy
Processing & Manufacturing
Water

How We Help
Advise
Design
Build

About Us
Team
Systems
Our Why

Our Experience

Riding the wave of success with Australia’s first man-made surfing lagoon

The Urbnsurf Tullamarine project delivered Australia’s first major man-made surfing lagoon. The wave generating equipment was provided by Spanish technology provider WaveGarden, while the local team developed all the other facilities to create a world-class surfing...

Future proofing NextDC’s standby power system

NEXTDC’s ‘P2’ Data Centre in Perth’s CBD is configured to have 12 standby diesel generators to ensure reliability and to maintain operations without interruption all day, everyday. The initial install consisted of three generators plus the common infrastructure for...

Lighting up Australia with solar thermal power

Vast Solar built Australia’s first 6MWh (1.1MWe) concentrated solar thermal plant with thermal energy storage, to be connected to the power grid. The $10 million project is half funded by the Australian Renewable Energy Agency (ARENA) and is the pilot plant for a...

Sydney
Level 2, 76-80 Clarence St
Sydney NSW 2000
T. 1800 955 802
Email us

Perth
Level 1, 3 Craig St
Burswood WA 6100
T. 1800 955 802
Email us

Industry Expertise
Energy
Processing & Manufacturing
Water

How We Help
Advise
Design
Build

About Us
Team
Systems
Our Why

Our Experience

Riding the wave of success with Australia’s first man-made surfing lagoon

The Urbnsurf Tullamarine project delivered Australia’s first major man-made surfing lagoon. The wave generating equipment was provided by Spanish technology provider WaveGarden, while the local team developed all the other facilities to create a world-class surfing...

Future proofing NextDC’s standby power system

NEXTDC’s ‘P2’ Data Centre in Perth’s CBD is configured to have 12 standby diesel generators to ensure reliability and to maintain operations without interruption all day, everyday. The initial install consisted of three generators plus the common infrastructure for...

Lighting up Australia with solar thermal power

Vast Solar built Australia’s first 6MWh (1.1MWe) concentrated solar thermal plant with thermal energy storage, to be connected to the power grid. The $10 million project is half funded by the Australian Renewable Energy Agency (ARENA) and is the pilot plant for a...

Sydney
Level 2, 393 George Street
Sydney NSW 2000
T. +61 2 8296 6500
Email us

Perth
Suite 9/19 Essex Street
Fremantle WA 6160
T. +61 410 471 572
Email us

Copyright © 2025 CNFiTech Pty Ltd · Crafted by Growth Studios